Seattle · Notes from the building side
Every nail is a decision.
How a part is fastened decides whether it can ever be repaired, moved or used again. Field notes on materials, assembly and upkeep from a Seattle builder that keeps what it builds.
Use the lowest rung of fastening that does the job, and write down why. Nothing may be fastened through a layer that should outlive it. Never run a pipe through the structure. Draw the building coming apart as well as going together. Repair before replace. The cheapest wins are on paper. A smooth nail comes out; a ringed nail through glue does not. Specify removal, not only installation. Build one bay, take it apart, and time it. The stopwatch is the only honest measure. Complete drawings. A clean, ready site. A schedule with slack. Prompt pay. A record of what went in. Long life, loose fit.



Fig. 1: how it goes togetherSite Walk No. 01 · November 2–10, 2026
The longest stage
Finishes take longer than framing, a Sydney factory takes months off the schedule, residential crews shrink and Washington bends its energy code for homes lost to fire.
- A thousand board feet of framing lumber: $449Materials
- The longest stage of a house is the finishesInstallation
- Nine factory-built homes, done in about eight monthsFabrication
- Residential crews shrank in October while the rest of construction hiredInstallation
- Washington bends its energy code for homes lost to fireDurability

this weekHabits of the trade, questioned
Questions from the job site
Most building methods are habits. These are the ones we are testing, with where we stand so far and what would change our mind.
Eight stages
The life of a building, in order
From the first board to the fiftieth winter. Each stage has its own page.


what is it made ofMaterials
What a building is made of, chosen for its whole life and for the place it has to stand in.


a kit of partsComponents
A building as a kit of parts, each with a name, a record and a way back out.

made under a roofFabrication
Where and how the parts are made, in a shop where accuracy is cheap or on a site where it is not.

one fastener at a timeAssembly
How parts are joined. Every fastener decides whether a part can ever be repaired, moved or used again.

ready on TuesdayInstallation
The job site itself. Sequence, tolerance and the conditions that let a crew do good work.

repair before replaceMaintenance
Looking after a building is part of building it. Repair comes before replacement.



seven on a January morningLivability
The test of a building is living in it. Quiet, light, warmth, clean air and ease, year after year.


long life, loose fitDurability
How long it lasts, how well it takes its next change, and whether its joints will still open when the time comes.
Field notes
How things go together
AssemblyComponents
Every nail is a decision
Whether a part of a house can ever be repaired, moved or used again is settled by how it was fastened. A six-rung ladder makes that choice visible.
AssemblyMaintenance
Five layers, five lifespans
A building is not one thing that ages at one speed. Keep its fast parts from being trapped behind its slow ones, and most demolition never has to happen.
AssemblyMaterials
Twelve swaps
Twelve ordinary building details, each beside a version that can be taken apart again, with what it costs and what to watch for.
How we mean to build
A job a crew can count on
Good work needs good conditions. These are the promises we are writing down for every job, so that we can be held to them.

Fig. 2: one bench- 1Complete drawingsEvery part drawn and specified before anyone is asked to price it.
- 2A clean, ready siteA checklist with a named owner, not a hope.
- 3A schedule with slackFloat where trades meet, so one delay cannot topple the rest.
- 4Prompt payInvoices paid on a stated day, every time.
- 5A record of what went inSo the next person can repair it or take it apart.
A few rules from our drafting table:
- Use the lowest rung of fastening that does the job, and write down why.
- Nothing may be fastened through a layer that should outlive it.
- Never run a pipe through the structure.
- Draw the building coming apart as well as going together.
- Repair before replace.
- The cheapest wins are on paper.
Every Monday
Get Site Walk as it comes out
A weekly walk through what changed in materials, methods and the building trades, and what it means on the job.
Words on this site are free to copy, adapt and build on, as long as you credit Viridian Builds and share what you make the same way.